Gridlock on Kara bridge to end Sunday – Gov. Abiodun

Gridlock on Kara bridge to end Sunday – Gov. Abiodun

Ogun State Governor, Dapo Abiodun
The Ogun State governor, Dapo Abiodun, on Saturday, says he had extracted a commitment from the contractors handling the Kara end of the Lagos-Ibadan expressway that the part of the road would be completed and open to traffic on or before Sunday, April 30, 2023.




Abiodun disclosed that he got the commitment on Friday from the contractor through the Federal Comptroller of Works when he had an on-the-spot assessment on the cause of the constant gridlock on the road which had been causing the people discomfort.

READ ALSO  2023: Fayose donates hotel in Ibadan for Peter Obi’s ‘obidient’ election campaign

He said, “On Friday, I stopped at Kara and made a piece of my mind known to the contractor handling the Kara end of the Lagos-Ibadan expressway, my stopping there was with respect to the very poor traffic management and the resulting traffic gridlock subjecting innocent travellers to untold hardship.

“I am glad to note that I was able to extract from the firm handling the construction of the Lagos-Ibadan expressway through the Federal Comptroller of Works a commitment to complete the construction causing the bottleneck on or before Sunday 30th April and open the road to allow free flow of traffic both outbound and inbound Lagos.”

READ ALSO  FG may release detained terrorists in exchange for 68 train hostages

Abiodun, however, expressed optimism that the commitment he extracted from the contracting firm would go a long way toward ensuring that the persistent gridlock affecting road users on the Lagos-Ibadan expressway becomes a thing of the past.

He urged road users plying the road to be a little bit patient with the government as the road is about to be opened to vehicular traffic.

READ ALSO  Reno Omokri Reacts As Tinubu Becomes President

The road was flagged off by former President, Dr. Goodluck Jonathan in 2013 at a cost of N167 billion naira and contracted to Julius Berger Nigeria Plc and Reynolds Construction Company Limited respectively.

The road was expected to be commissioned before the end of the administration of the President, Major General Muhammadu Buhari (retd.).

0Shares
images 9 2

Recommended For You

About the Author: Akelicious

Leave a Reply